The primary park features a ability of two hundred MW although Sandrini II features a capability of a hundred MW. The total price of both of those projects were not disclosed nonetheless, all through construction, over two hundred workers ended up utilized. The initiatives are envisioned to determine a handful https://www.diigo.com/item/note/asc9s/2yos?k=09e329f043f687d41fdc7c4d0be3f9da