The startup and commissioning (tests) process is completed once the technique is completely set up and ready to work. The method is turned on and must operate for 15-20 minutes. This enables the refrigerant to move from the process and start the air conditioning method. A great installer will check https://glowingdirectory.com/listings13055185/top-air-conditioning-installation-secrets